If you have received three offers and they look nothing alike, the problem is not necessarily the price. You may simply not be offered the same thing.
At first sight, two 200 kWp plants should produce roughly the same energy. In reality, differences can arise in the DC/AC configuration, the quality of documentation, the mounting system, the protection solutions, grid connection conditions, the level of self-consumption and after-sales services. Price per kWp simplifies the discussion, but it can hide exactly the elements that matter after the contract is signed.
1. Check which capacity is quoted
The capacity of the panels (kWp DC) is not the same as the rated power of the inverters (kW AC). Ask for both values and an explanation of the DC/AC ratio. Two offers with the same DC capacity can have different production limits or costs because of the electrical architecture.
2. Ask for the same basis for production
The estimated annual production should state the location, orientation, tilt, shading, losses, the source of irradiation data and the assumed degradation. Ideally you receive both the total production and the energy likely to be self-consumed. In a single-shift factory, weekend self-consumption can differ substantially from weekdays.
3. Compare the scope of supply, not just the equipment
An EPC package can include design, documentation, structure, panels, inverters, cables, protection, switchboards, changes to the existing installation, integration into monitoring, acceptance and support. Put all lines in one table: included, excluded or to be clarified. Do not assume that "turnkey" means the same thing for every bidder.
4. Ask where the contractor's responsibility ends
Who coordinates the documentation for the distribution operator? Who is responsible for the interface with the main switchboard? Who performs the tests? What happens if structural or electrical limitations are found during the site visit? A good offer has clear answers, not just a total at the end.
5. Compare the economic result in three scenarios
A single payback period can suggest a precision that does not exist. Ask for prudent, base and favourable scenarios, with assumptions on tariffs, self-consumption, maintenance and, where relevant, financing. A sound investment should still hold up if one of the parameters changes.
Checklist for the discussion with the bidder
| Question | Why it matters |
|---|---|
| How many kWp DC and how many kW AC? | Defines the real architecture |
| What production is estimated, and on what data? | Allows a technical comparison |
| How much do we consume directly? | Drives most of the savings |
| Which works are excluded? | Prevents extra costs |
| Who handles grid connection and acceptance? | Clarifies responsibilities |
| What does O&M mean, and on what terms? | Protects operation |
The key idea: the best offer is not the one promising the lowest price per kWp, but the one that explains why the proposed configuration is right for your company.
Want to compare offers on the same basis? Send your consumption and the configurations, and the SmartFotovoltaic team can discuss the technical and economic differences. Discuss your project.