For a company, the right question is not just "how much do the panels cost?", but how much will the energy produced by the plant cost, and how much of it will the business actually use. Two halls with the same surface can require very different investments and deliver very different savings if their working hours, consumption or grid connection are not comparable.
What goes into the price of an EPC project?
A complete EPC offer can include the initial study, design, solar equipment, mounting structures, cables, switchboards and protection, installation, testing and commissioning. Grid connection costs, structural assessment, reinforcement works and a BESS should be listed separately where applicable. Compare offers on the same contractual basis, not only on euro per kWp.
Why does the price differ between 50 and 500 kWp?
The unit cost can fall at higher capacities thanks to economies of scale, but there is no universal rule. The roof, inverter configuration, cable lengths, safety routes, type of installation and the distribution operator's requirements can change the budget significantly. If the project includes batteries, both the energy capacity (kWh) and the battery power (kW) matter.
How do you estimate savings correctly?
Start from hourly or 15-minute consumption data, not just the annual bill. Estimate production month by month, then determine the energy consumed directly, the energy stored and the surplus fed into the grid. Energy used on site can have a different economic value from exported energy. Deduct operating and maintenance costs, foreseeable replacements and the cost of financing to calculate the cash flow.
When is leasing worth it?
Leasing or rental can preserve the company's liquidity. But the instalment, down payment, interest, additional costs and final terms are set after a financial analysis. The right comparison is between the total cost and the net cash flows of each scenario, not between the estimated instalment and the theoretical maximum production.
What information should you prepare for an offer?
A recent bill, consumption for the last 12 months, the hourly profile if available, the address and roof type, the capacity in the grid connection approval and the project objectives. On this basis a first estimate can be made, and the final offer is prepared after the technical checks.
Simulate the budget and savings for your company: Industrial calculator. For a tailored offer: Request a quote.