Cost and return
How much does an industrial solar power plant cost?
The cost depends on capacity, the type of roof or land, equipment, switchboards, protection, cable routes and grid connection conditions. For a fair comparison, ask for an offer that states explicitly what it includes and what it excludes. Learn more →
What is the price per kWp?
The price per kWp can guide a discussion, but it is not enough to compare two industrial projects. One may include design, grid connection, BESS and monitoring, while another covers only equipment and installation. Learn more →
How many years does it take for solar panels to pay back for a company?
Payback follows from the total investment and the net annual savings, calculated on consumption during production hours. Avoid estimates that treat all solar production as self-consumed energy. Learn more →
How do I calculate savings if we only work Monday to Friday?
Working days must be separated from weekends and days off. Surplus produced while the factory is closed is valued differently from energy consumed immediately. Learn more →
Is a system larger than my daytime consumption worth it?
Not necessarily. A larger system can create more surplus, and its value may be lower than that of the energy avoided through self-consumption. The decision is made by comparing capacity scenarios. Learn more →
Which indicators should I see in an offer?
DC and AC capacity, annual production, self-consumption, exported energy, savings, total cost, O&M, tariff assumptions, payback and sensitivity. All the offers you compare should use similar assumptions. Learn more →
Design and roofs
Can the roof of my hall support panels?
The answer requires a check of the structure, the additional loads and the fixing method. Free surface is not automatically the same as installable surface. Learn more →
Can panels be mounted on sandwich panel roofs?
It is possible in certain configurations, but the fixing method must be compatible with the roof covering and the supporting structure. We check the documentation and the details of the mounting system. Learn more →
What if there are skylights or HVAC units on the roof?
They reduce and fragment the usable surface and affect cable routes and access for maintenance. The layout must meet the applicable technical and safety requirements. Learn more →
How much capacity fits on 1,000 m²?
There is no universal conversion. The module, orientation, row spacing, exclusion zones and access for maintenance change the result significantly. Learn more →
Can I install panels on the ground?
Yes, if the land, its legal status, planning conditions and the electrical connection allow the investment. Ground-mounted structures have different requirements from a hall roof. Learn more →
What does EPC mean?
EPC stands for Engineering, Procurement and Construction. What matters is that responsibilities for permits, testing, acceptance and post-installation support are clearly defined. Learn more →
Which documents help with an estimate?
The energy bill, the location, address and type of building, a roof plan if available and, ideally, consumption at hourly intervals. For a final offer, the necessary technical checks are added. Learn more →
BESS storage
Do I need batteries if I have solar panels?
Not automatically. Storage makes sense when surplus and later consumption, peak reduction or a continuity objective justify the additional investment. Learn more →
What is the difference between kW and kWh for batteries?
kWh describes the energy stored; kW describes the power available for charging or discharging. Both matter for sizing. Learn more →
What is peak shaving?
The controlled use of a battery to reduce the power peaks drawn from the grid. Its economic value depends on the tariff structure and the shape of real consumption peaks. Learn more →
Will a battery keep my factory running if the grid fails?
Only if the installation has been designed for compatible backup operation, with suitable isolation and protection. Many grid-connected BESS do not automatically provide backup during a power cut. Learn more →
Can I install batteries without solar panels?
Stand-alone storage applications exist in principle, but technical and economic feasibility is analysed separately. The charging strategy, operating rules and the purpose of the investment become decisive. Learn more →
How big should the battery be?
We start from the battery's objective and from the consumption and production curves. Sizing based only on the capacity of the panels risks an unsuitable battery size. Learn more →
Financing and leasing
Can I install solar through leasing?
There are financing products for energy equipment aimed at companies. Eligibility, down payment, costs and term are set by the financier and are not the same for every applicant. Learn more →
Is leasing better than an outright purchase?
It depends on whether the priority is the total financial cost or preserving liquidity. A fair comparison includes the instalment, interest, fees, residual value, operating costs and energy savings. Learn more →
Can the instalment be lower than the energy savings?
It is possible in some scenarios, but it is not a guarantee. The difference depends on actual production, self-consumption, tariffs, financing terms and seasonality. Learn more →
Do I have to pay for the whole project before installation?
The payment schedule depends on the contract and the financing. Ask for payments to be linked to the stages of delivery, installation, testing and acceptance. Learn more →
Are there grants for companies?
Funding programmes may be available at certain times, but eligibility and timing must be checked for the active call. An investment decision should not rest solely on a grant that has not yet been approved. Learn more →
Operation and maintenance
What does maintenance of an industrial plant include?
Usually monitoring, inspections, checks, reports and contractually agreed interventions. Exactly what is included, how often and with what response time should be set out in the O&M agreement. Learn more →
Do panels need regular cleaning?
Whether and how often depends on deposits, tilt, environment and the estimated impact on production. Cleaning should be economically justified and carried out safely. Learn more →
What happens if an inverter stops?
Monitoring can detect the deviation; then the error log, protection and operating conditions are checked. A good contract specifies the intervention procedure and responsibilities. Learn more →
Can I contract maintenance for a system installed by another company?
Yes, after assessing the installation, access to the monitoring platforms and the available documentation. Problems found at takeover should be recorded separately. Learn more →
How do I know whether the plant produces as much as it should?
Do not just compare one year with another. Track production against irradiation, equipment availability and any limitations or shutdowns. Learn more →
Grid and operation
What does zero export mean?
Controlling the system so that it limits the energy fed into the grid at a defined metering point. It requires correct metering, compatible control and checks during rapid load changes. Learn more →
Can I use the energy for self-consumption only?
Yes, the system can be designed for self-consumption with export limitation, under the applicable technical conditions. The connection regime must be checked for the specific project. Learn more →
If I have two supply points, can I install a single system?
The configuration depends on the electrical diagram, ownership and metering boundaries, protection and the grid operator's requirements. A technical analysis is needed before a final solution. Learn more →
Can I combine panels with a charging station?
Yes, but charging stations have their own hourly profile and power peaks. The plan covers available power, charging control and how solar production is used. Learn more →
What is the difference between self-consumption and export?
Self-consumption is the energy used directly by the company; export is the energy sent to the grid. In the financial analysis, the two quantities can have different economic values. Learn more →
Already have your consumption data and a site? Move from questions to a project analysis.